Living room · 16 steps
Media Console
A 60 in plywood media console with three open bays, a shelf and a cable gap, from one sheet. Anchored to the wall.

- Finished size
- 60" W x 16" D x 24" H
- Metric
- 1524 mm x 406 mm x 610 mm
- Material
- 3/4" plywood, one 4 x 8 ft sheet
- Steps
- 16
- Build time
- 1 day
- Skill
- Beginner
What you will build
This DIY TV stand is a low media console 60 in long, 16 in deep and 24 in tall, built from one 4 x 8 ft sheet of 3/4 in plywood. A beginner can build it in about a day with a circular saw, a drill and a pocket-hole jig. Two dividers make three open bays, each 19 in wide and 19-1/2 in tall, and a fixed shelf splits the middle bay into a 10-1/4 in and an 8-1/2 in opening. Two back rails, one under the top and one on the bottom, keep the case square; the open back between them leaves an 11-1/2 in tall cable gap behind every bay. The case stands on a plinth set back 1-1/2 in at the front and the ends. Every joint is glued and fixed with 1-1/4 in pocket screws (42) or with 12 screws up through the bottom, so no joint screw shows on the top or the front, and iron-on edge banding covers the plywood edges that show. The plan has 13 parts, no doors and no drawers, and it ends with anchoring the console to the wall. These media console plans give one size: check that your TV stand or base fits on the 60 x 16 in top.
Cut list
All 13 parts and the two spacers: one 4 x 8 ft sheet of 3/4 in plywood (step 3).
| Part | Name | Material | Qty | Length | Width |
|---|---|---|---|---|---|
| A | Top | 3/4" plywood | 1 | 60" (1524 mm) | 16" (406 mm) |
| B | Side | 3/4" plywood | 2 | 19-1/2" (495 mm) | 16" (406 mm) |
| C | Bottom | 3/4" plywood | 1 | 60" (1524 mm) | 16" (406 mm) |
| D | Divider | 3/4" plywood | 2 | 19-1/2" (495 mm) | 15-1/4" (387 mm) |
| E | Shelf | 3/4" plywood | 1 | 19" (483 mm) | 15-1/4" (387 mm) |
| F | Back rail | 3/4" plywood | 2 | 58-1/2" (1486 mm) | 4" (102 mm) |
| G | Long kick | 3/4" plywood | 2 | 57" (1448 mm) | 3" (76 mm) |
| H | End kick | 3/4" plywood | 2 | 12" (305 mm) | 3" (76 mm) |
Tools
- Circular saw
- 4 ft straightedge
- Bar clamps (4)
- Tape measure
- Speed square
- Iron (household or edge-banding iron)
- Utility knife
- Drill / driver
- Pocket-hole jig
- 3/16" drill bit
- Countersink bit with 1/8" pilot drill
- 7/64" drill bit, 6 in long
- Random orbit sander
- Stud finder
Materials
- 13/4" plywood sheet, 4 x 8 ft
- 42 + 1 for the test1-1/4" coarse-thread pocket screws (a box of 100 is fine)
- 12#8 x 1-5/8" flat-head wood screws (bottom; 12 needed)
- 4#8 x 5/8" pan-head screws (for the anti-tip brackets)
- 1Wood glue
- 1Iron-on edge banding, 13/16" wide, 50 ft roll (wood to match the plywood)
- 1 setSandpaper 120 / 180 / 220 grit
- 1Wipe-on polyurethane (or stain + poly)
- 1Furniture anti-tip kit (wall straps), 2 pack
- 1 packComposite shims (for a sloped floor)
- 1Rigid foam board, 2" thick, 4 x 8 ft (work surface)
Tool and material links are affiliate links. Disclosure.
Step-by-step instructions
The same steps as the interactive 3D guide, where each step is animated.
1The finished project
A media console 60" long, 16" deep and 24" tall, with three open bays and a shelf, from one sheet of 3/4" plywood.
- Read every step once before you cut anything.
- The top A, 60" long, sits on two sides B, and the sides stand on the bottom C, also 60" long. Two dividers D make three bays, each 19" wide and 19-1/2" tall. The shelf E splits the middle bay: 10-1/4" open below it and 8-1/2" above it.
- Two back rails F, 4" tall, run between the sides behind the dividers, one under the top and one on the bottom. They keep the case square. The open back between them, 11-1/2" tall, is the cable gap behind every bay.
- The case stands on a plinth: two long kicks G and two end kicks H, 3" tall, set back 1-1/2" from the front and the ends and 1" from the back.
- Every joint is glued. 42 pocket screws and 12 screws up through the bottom hold it, so no joint screw shows on the top or the front. Iron-on edge banding covers the plywood edges that show. You need a helper in steps 8, 10 and 13.
- Done when: you can name the 13 parts and see where the cable gap is.
Not rated: this plan gives no weight number and no TV size. Check that the stand or base of your TV fits on the 60" x 16" top.
A TV and its stand can tip over. Step 15 anchors the console to wall studs; secure the TV as its maker or the mount maker says.
2Tools & materials
Gather everything before you start.
- Buy one 4 x 8 ft sheet of 3/4" plywood; birch plywood takes banding, stain and clear finish well.
- Measure the sheet thickness t: plywood sold as 3/4" is often about 23/32". The cut list stays the same; steps 9 and 13 cut the two rails to the opening you measure.
- Pick up 42 pocket screws plus 1 for the test, 1-1/4 in long with coarse threads, twelve #8 x 1-5/8 in flat-head screws for the bottom, four #8 x 5/8 in pan-head screws for the anti-tip brackets, wood glue and iron-on edge banding 13/16" wide: about 292" (24 ft) with the trimming, so get the 50 ft roll: a 25 ft roll is too tight.
- Get an anti-tip kit with two straps (step 15), shims, and a 2" rigid foam board to cut and work on.
- Done when: everything on both lists is in the shop and you know your sheet thickness.
Wear eye and hearing protection. A 4 x 8 ft sheet is bulky: carry it with a helper.
3Cut the plywood
Cut the top, bottom, two sides, two dividers, shelf, two rails, four kicks and two spacers from one sheet of 3/4" plywood.
- Lay the sheet on the foam board, better face down (a circular saw splinters the face on top), and set the blade about 1/4" deeper than the plywood. For every cut, clamp the straightedge to the sheet as a saw guide.
- Cut 1: crosscut the sheet 60" from one end. Rip this piece into two strips 16" wide: top A and bottom C. Then rip two strips 4" wide for the rails F and two strips 3" wide for the long kicks G. Leave the rail strips 60" long: steps 9 and 13 cut them to length. Crosscut each kick strip to 57".
- Cut 2: crosscut the other piece 19-1/2" from its cut end. Rip that piece into two strips 16" wide: sides B. Rip the rest to 15-1/4" wide and crosscut it to 19" long: shelf E.
- From the last piece (about 16-1/4" wide): crosscut two pieces 19-1/2" long and rip each to 15-1/4" wide: dividers D. Their face grain runs front to back, which does not matter for a divider. From the rest, rip two strips 3" wide and cut them 12" long: end kicks H.
- Cut two spacers 8-1/2" x 2-1/2" from the offcut, drawn dashed on the diagram: they hold the shelf in step 10. Pencil the letter on every part and keep the offcuts for test holes.
- Done when: the 11 parts are cut (the two rail strips wait) and both sides, both dividers and both long kicks are the same length.
Most home centers will make these cuts on their panel saw: show them this diagram.
Each cut removes about 1/8" of wood (the saw kerf): the layout allows for it.
Cut both sides and both dividers exactly 19-1/2" long, or the top will not sit flat.
4Edge band the exposed edges
Mark the parts, then iron edge banding onto the 11 plywood edges that show: three on the top, three on the bottom and the front edge of both sides, both dividers and the shelf.
- Mark the faces first. Top A and bottom C: pencil UNDER on the worse face and FRONT on one 60" edge. Sides B: OUT on the better face, FRONT on one 19-1/2" edge and TOP on one 16" end. Dividers D: OUT on one face, FRONT on one 19-1/2" edge and TOP on one 15-1/4" end. Shelf E: UNDER on the worse face and FRONT on one 19" edge. Kicks G and H: IN on the worse face and TOP on one long edge.
- Band these edges: the FRONT edge and both ends of A and of C, and the FRONT edge of each side, each divider and the shelf. Leave every other edge bare: the back edges face the wall, the ends of the sides and dividers sit in joints, and the plinth stays bare.
- Cut each strip about 1" longer than its edge. Lay it glue side down, centered on the edge, and press the iron slowly along it at the setting on the roll, then rub it down with an offcut block while it cools.
- Trim the ends flush with the utility knife, then trim the overhang flush with both faces, cutting away from your other hand. On A and C, band the FRONT edge first, then the ends, so the end strips cover the ends of the front strip.
- Sand the trimmed edges lightly with 180 grit on a block, stroking toward the face so the banding does not lift.
- Done when: the 11 edges are banded and trimmed, and every part is penciled.
The iron and the melted glue are hot. Keep your fingers off the banding until it cools.
The banding is very thin: never sand through it at the corners.
5Drill the pocket holes in the sides and dividers
Test the jig, then drill three pocket holes at the TOP end of each side and two at the TOP end of each divider: 10 holes.
- Set the jig and its drill collar for 3/4" material. Drill a test hole in an offcut and drive a 1-1/4 in pocket screw into a second offcut (the extra screw): the tip must stay inside.
- Sides B: lay each one on the foam board with the inside face up (the face without OUT) and the TOP end toward you. Mark three holes along the TOP end, 2-1/2", 8" and 13-1/2" from the FRONT edge. Clamp the jig flush with the TOP end at each mark and drill. The holes slant toward the end: they hold the side to the top.
- Dividers D: lay each one OUT face up, TOP end toward you, and drill two holes the same way, 3" and 11-1/2" from the FRONT edge. In the console, the OUT face of each divider looks toward the nearest end bay, so these holes stay out of the middle bay.
- Done when: each side has three holes and each divider two, all at the TOP end, in the inside face of the sides and the OUT face of the dividers.
Clamp the jig to the part every time; never hold it by hand. Plugs can hide these holes if you want.
6Drill the pocket holes in the shelf and the plinth
Drill two pocket holes at each end of the shelf, and the 14 pocket holes of the four kicks: 18 holes.
- Shelf E: lay it UNDER face up. At each end mark two holes, 3-1/2" and 11-1/2" from the FRONT edge, clamp the jig flush with the end and drill. They hold the shelf to the dividers.
- Long kicks G: lay each one IN face up. Mark four holes along the TOP edge, 5-1/2", 21-1/2", 35-1/2" and 51-1/2" from one end, clamp the jig flush with the TOP edge and drill. They hold the plinth to the bottom.
- End kicks H: lay each one IN face up and drill one hole along the TOP edge, in the middle, 6" from either end. Turn it over, OUT face up, and drill one hole at each end, 1-1/2" from the TOP edge, jig flush with the end: they hold it to the long kicks.
- Done when: the shelf has two holes at each end, each long kick four, and each end kick one in its IN face and two in its OUT face.
Clamp the jig to the part every time. Never hold it by hand while drilling.
The jig must sit flush with the TOP edge of each kick: the holes there slant up into the bottom.
7Drill the bottom
Drill and countersink 12 screw holes in the UNDER face of the bottom: three under each side and three under each divider.
- Lay the bottom C on the foam board, UNDER face up, FRONT edge toward you.
- Draw four lines across it with the speed square: 3/8" from each end (the middle of the sides) and 20-1/8" from each end (the middle of the dividers).
- On each line mark three holes, 3", 8" and 13" from the FRONT edge: 12 marks.
- Drill a 3/16" clearance hole through the bottom at each mark, then countersink each hole on the UNDER face until a screw head sits just below the surface (test on an offcut first).
- Done when: the bottom has 12 countersunk holes in four rows, the countersinks on the UNDER face.
Drill straight and square to the face: each screw must land in the middle of an edge that is only 3/4" thick.
8Stand the sides on the top and square them
Glue the two sides to the UNDER face of the top, drive the back screw of each, make both diagonals equal, then drive the other four screws.
- Lay the top A on the foam board, UNDER face up. The console is built upside down from here until step 13; the drawing shows it from below.
- One side at a time: spread glue on its TOP end and stand it on the top, TOP end down, flush with the end of the top and with its FRONT and back edges, OUT face outward. Your helper holds it upright while you drive its back pocket screw, the one 13-1/2" from the FRONT edge.
- Measure both diagonals across the front, from the loose front corner of each side to the far front corner of the top that rests on the foam: they must be equal (63-5/16" in the model). The sides must also be 58-1/2" apart at their loose ends. If not, push the loose ends until both checks match.
- Then drive the other two screws in each side, 2-1/2" and 8" from the FRONT edge. Wipe off the glue squeeze-out.
- Done when: both sides stand flush with the ends of the top, the diagonals match and six screws are in.
Check the diagonals before the last four screws: once they are in, the sides can no longer be squared.
9Cut, drill and fit the top rail
Cut the first rail strip to the opening between the sides, drill its seven pocket holes and glue it under the back edge of the top.
- Measure between the sides at their back edges, right at the top: 58-1/2" with 3/4" plywood. Crosscut one rail strip to that length, or up to 1/32" shorter, never longer: it drops into an opening with no clearance. This is rail F1.
- Pencil BACK on its worse face and TOP on one long edge. With the BACK face up, drill two pocket holes at each end, 1" from each long edge, with the jig flush with the end. Then drill three holes along the TOP edge, one 9-1/4" from each end and one in the middle, with the jig flush with the TOP edge.
- Spread glue on the TOP edge and both ends. Lower F1 between the sides, TOP edge down on the top, BACK face flush with the back edges of the top and the sides.
- Hold it flush and drive the three TOP edge screws, then two into each side, the drill level behind the rail, handle turned sideways or up.
- Done when: F1 sits flush with the back edges of the top and the sides, with seven screws in.
Cut the rail to your measured opening, not to the cut list: a long rail pushes the sides out of square.
10Fit the dividers and the shelf
Stand the two dividers on the top with the shelf between them on two spacers, then glue and screw the dividers and the shelf.
- Measured from each end of the top, pencil a line across the UNDER face at 20-1/2": the inside face of each divider goes on this line, so the middle bay is exactly 19".
- Glue the TOP end of one divider and stand it on the top, TOP end down, outside its line, OUT face toward the nearest end, FRONT edge flush with the front, back edge against F1. Your helper holds it square while you drive its two pocket screws.
- Stand the two spacers on end in the middle bay, about 2" from the front and the back. Glue both ends of the shelf E and set it on them against that divider, UNDER face up (pocket holes up), FRONT edge flush.
- Glue and stand the second divider on its line, against the other end of the shelf; your helper holds it while you drive its two screws, then the four shelf screws. Pull the spacers out the front.
- Done when: both dividers stand on their lines, the shelf is in with four screws, and the spacers are out.
Drive the second divider screws only with the shelf in place: it sets the spacing.
11Screw on the bottom
Glue the bottom onto the bottom ends of the sides and dividers, check the diagonals and drive its 12 screws.
- Glue the bottom ends (now facing up) of the sides and dividers. Lay the bottom C on them, UNDER face up, flush with the ends, the front and the back edges of the sides.
- Look into each hole: an edge must be centered under it. Only the loose ends of the dividers can still move: push one sideways if needed.
- Check both diagonals across the front, from each upper front corner of the bottom to the far front corner of the top on the foam: they must be equal (63-9/16" in the model). This confirms step 8; if they differ, recheck step 8 first.
- Through each hole, drill a 7/64" pilot about 7/8" into the edge below with the long bit, and drive a #8 x 1-5/8 in screw: the four corner screws first, check the diagonals once more, then the other eight.
- Done when: the bottom is flush on every edge, the diagonals match and 12 screws are in.
Plywood edges hold screws less well than a face: drill every pilot straight down and glue every joint.
12Build the plinth on the bottom
Screw the four kicks into a frame, square it and glue and screw it to the UNDER face of the bottom.
- On the foam board, stand the long kicks G on edge, IN faces facing each other and TOP edges up, with the end kicks H between them, IN faces inward, outer faces flush with the ends of the long kicks. Glue the end joints and drive the four pocket screws from outside, through the OUT face of the end kicks into the long kicks, drill handle turned up or that end over the edge of the foam board.
- Measure both diagonals of the frame, outside corner to outside corner: both must be 58-9/16". Push it until they match.
- On the UNDER face of the bottom, pencil lines 1-1/2" from the FRONT edge, 1-1/2" from each end and 1" from the back edge. Spread glue on the TOP edges of the kicks, turn the frame over (TOP edges down) and lay it on the bottom inside the lines, the front kick on the FRONT side.
- Drive the ten pocket screws from inside the frame into the bottom: four per long kick, one per end kick.
- Done when: the plinth sits on the lines, its diagonals match and 14 screws are in.
The plinth goes on the UNDER face: the 12 screw heads of step 11 stay outside it or inside the frame, never under a kick.
13Turn it over and fit the bottom rail
Stand the console on its plinth, cut the second rail to the opening at the back of the bottom and glue and screw it in from behind.
- With your helper, turn the console over onto its plinth, away from the wall.
- Measure between the sides at the back, right on the bottom (58-1/2" with 3/4" plywood) and cut the second rail strip to it, or up to 1/32" shorter: rail F2. Pencil BACK on its worse face and BOTTOM on one long edge.
- Drill its seven pocket holes in the BACK face as for F1, with BOTTOM in place of TOP.
- Glue the BOTTOM edge and both ends. From behind, set F2 on the bottom, BOTTOM edge down, and push it in 3/4" until its BACK face is flush with the back edges: its front face touches the dividers.
- Drive the three BOTTOM edge screws, then two into each side, drill handle turned sideways or up. Wipe off the squeeze-out.
- Done when: F2 is flush at the back with seven screws in, and the cable gap is 11-1/2" tall.
Turn it over with a helper. If F2 binds, trim its ends: never hammer it in.
14Sand and finish
Sand the console smooth and apply a finish if you like.
- Sand every face with 120, 180 and then 220 grit. Sand the banded edges lightly by hand and ease the corners of the top.
- Wipe off the dust. The finish is optional: two or three thin coats of wipe-on polyurethane, sanded lightly with 220 grit between coats. Stain first if you like, or use a primer and paint. Follow the directions on the can and let it dry fully.
- Done when: every surface is smooth and the finish is dry.
Finish in a ventilated room and follow the safety directions on the can. Oily rags can catch fire on their own: lay them flat outdoors to dry.
15Anchor it to the wall
Anchor the console to two wall studs with the anti-tip kit before anything goes on it.
- Set the console where it will stay, its back against the wall. Push on each top corner: it must not rock. If it rocks or the floor slopes, slide shims under the plinth on the low side.
- Find two studs behind the console with the stud finder and mark them on the wall just above the top. A 60" long console has at least two studs behind it; studs are usually 16" apart.
- Screw one furniture bracket of the kit to the top face of the top A at each stud line, centered 2" from the back edge, strap end toward the wall, with two #8 x 5/8 in pan-head screws each: in the 3/4" top they stop 1/8" short of the underside.
- Screw each wall bracket into its stud at or just above the top of the console, with the screws the kit gives for wood studs, then join and tighten each strap as the kit instructions say.
- Done when: both straps are tight and the console does not tip or rock when you pull on the top front edge.
Furniture with a TV on it can tip over and crush a child. The U.S. Consumer Product Safety Commission recommends anchoring furniture and TVs (Anchor It guidance). Anchor the console before you put anything on it.
Drywall alone will not hold a strap: the wall screw must go into a stud.
16Set up the TV and the cables
Set up the TV and run the cables.
- Use the top only if the TV stand or base fits fully on it, and secure the TV as the TV or mount maker says. Run the cables through the 11-1/2" gap. Never climb on the console.
- Done when: the TV is secured and the console stands still.
Not rated: no weight number and no TV size.
Media Console: frequently asked questions
What size is this DIY TV stand?
The Media Console is 60 in (1524 mm) long, 16 in (406 mm) deep and 24 in (610 mm) tall. It has three open bays, each 19 in (483 mm) wide, 19-1/2 in (495 mm) tall and 15-1/4 in (387 mm) deep to the back rails, and the shelf in the middle bay leaves a 10-1/4 in (260 mm) opening below it and an 8-1/2 in (216 mm) opening above it. Measure your TV stand or base and your devices before you build, and check that they fit the 60 x 16 in (1524 x 406 mm) top and the bays.
How much plywood do I need to build a TV stand?
The Media Console needs one 4 x 8 ft sheet of 3/4 in plywood. All 13 parts come out of it: the top and the bottom (60 x 16 in), two sides (19-1/2 x 16 in), two dividers (19-1/2 x 15-1/4 in), the shelf (19 x 15-1/4 in), two back rails (58-1/2 x 4 in), two long kicks (57 x 3 in) and two end kicks (12 x 3 in), with the saw kerf allowed for and offcuts left for two spacers.
How many screws does a TV stand need?
The Media Console uses 58 screws: 42 pocket screws 1-1/4 in long (plus one for a test hole), 12 #8 x 1-5/8 in flat-head screws and 4 #8 x 5/8 in pan-head screws, with wood glue in every joint. The pocket screws hold the top (10), the shelf (4), the two back rails (14) and the plinth (14); the 12 flat-head screws go up through the bottom into the sides and the dividers; the 4 pan-head screws hold the anti-tip brackets on the top.
What tools do I need to build a media console?
The Media Console needs 14 tools: a circular saw, a 4 ft straightedge, bar clamps, a tape measure, a speed square, an iron and a utility knife for the edge banding, a drill, a pocket-hole jig, a 3/16 in drill bit, a countersink bit, a 6 in long 7/64 in drill bit, a random orbit sander and a stud finder. A 2 in thick rigid foam board on the floor is the cutting and assembly surface, and most home centers will make the long plywood cuts for you.
How long does it take to build a TV stand?
The Media Console takes a beginner about one day to build, plus drying time for the finish. The plan has 16 steps, 13 parts and 58 screws; most of the time goes into cutting the sheet, ironing on the edge banding and drilling the pocket holes.
How do cables get through the back of the TV stand?
The Media Console has an open back between its two back rails: an 11-1/2 in (292 mm) tall gap behind every bay, from the top of the bottom rail to the underside of the top rail. Cables run through that gap to the wall, so the plan needs no drilled holes. The bays are open at the front too: the console has no doors and no drawers.
Does a TV stand need to be anchored to the wall?
Yes: anchor the Media Console to wall studs with a furniture anti-tip kit, and secure the TV itself as the TV maker or the mount maker says. The U.S. Consumer Product Safety Commission recommends anchoring furniture and TVs, because tip-overs injure and kill children (source: https://www.cpsc.gov/anchorit). The plan screws two kit brackets to the top of the console, 2 in (51 mm) from its back edge, with four #8 x 5/8 in pan-head screws, and the wall brackets go into two studs.
How much weight can this TV stand hold?
The Media Console is not rated: the plan gives no weight or load number and no TV size, because the console has not been load tested. Check that the stand or base of your TV fits on the 60 x 16 in (1524 x 406 mm) top, anchor the console, and secure the TV as its maker says. Never climb on the console or let children hang on it.
Get the next plan
We let you know when a new plan is published.
More plans
Plywood Bookshelf

A 6 ft bookcase from one sheet of plywood: five fixed shelves, a toe kick and a screwed-on back. Anchored to the wall.
View planLiving roomPlywood Coffee Table

A modern 48 in waterfall coffee table with a lower shelf, from one sheet of plywood. Pocket screws, none on top.
View planLiving roomModern C-Table

Slides over your sofa. Holds coffee, laptop and snacks. One plywood panel, one afternoon.
View plan